Design Criteria and Constraints

...

Design Criteria

  • Attenuate stormwater and storm surge peaks by 20% for a 100 year flood
  • Maintain a functional design life of 20 years given the projected sea level rise of .41 meters and the associated increase in salinity during that time.
  • Create a plant community with a Shannon Diversity Index of at least 2.5
  • Reduce Total Suspended Solids (TSS) by 20%
  • Remain within a $2,000,000 budget

...

Design Constraints

  • Preserve the Gethsemane Community Fellowship Church and McDemmond Center for Applied Research
  • Easily maintained by local maintenance crews
  • Minimal modification to existing transportation infrastructure (railroad, highway, parking lot)

Standards


Virginia DEQ Stormwater Design Specification no. 13: Constructed Wetlands

Sec. 5: Feasibility & Design Applications

Sec. 6.1: Sizing of constructed wetlands

Sec. 6.2: Minimum pool depth

Sec. 6.5: Conveyance and overflow

Sec. 6.9: Landscaping with native flora

ASCE 45-16: Standard Guidelines for the Design of Urban Stormwater Systems
VA DEQ BMP Clearinghouse Design Specifications:

No. 9.: Bioretention Ponds

No. 11: Wet Swales

No. 13: Constructed Wetlands